Size of project
The initial project consists of 14 floors for mixed use of trading floor, back office and general areas of which 3 floors have been completed. With a Main Computer Room and local Comms Rooms on each floor, there are in excess of 50,000 ports. In addition, there is an off-site datacenter that currently has around 25,000 ports.
When complete, the campus will have a totally managed installation of copper, fiber and voice connectivity of approximately 500,000 ports. With one remote site operational, a further ten are scheduled over the coming months.
Cast list
| Customer: |
Technology Infrastructure Department, Major Investment Bank in UK |
| RiT: |
William Ward , UK, Sales Director | |

|
|
Key advantages of the PatchView installation
- Reduced downtime & mean-time-to repair
- Improved compliance with physical network security standard
- Accurate real-time visibility into the physical connectivity
- Simplified routine provisioning and maintenance
- Improved resource allocation and utilization
- 100% accurate real-time documentation
|
|
Quote:
“Since the installation of PatchView, we have been able to focus on the important aspects of the job.
Previously we spent most of the time and resources on trying to ensure that both the implementation and documentation of the critical Moves Adds and Changes (MAC) were accurate.
The process was cumbersome and the documentation unreliable to meet and fulfill the ever more stringent audit trails, not to mention the downtime. PatchView has streamlined the process, the implementation and the documentation whilst reducing downtime and allowing time to focus on the planning and strategic thinking.
Furthermore, the accuracy of our data has not only allowed for improved service to the client, but faster implementation of MACs and improved uptime due to the increased knowledge and information within our control.“